Closed
New Bayswater Train Station - Drainage Install- Precast Concrete Pits-Pipes
Tender ID: 463625
Tender Details
Organisation:
Tender #:
-
Status:
Closed
Publish Date:
21 July 2021
Closing Date:
3 August 2021
Tender Description
Precast Concrete Pits and Pipe - Drainage Install
Overview
The Bayswater Station and Turnback Project (herein referred to as the “Project”) is a staged Redevelopment of the Bayswater Train Station.
The Project Works include all Design, Construction and Commissioning required to the Bayswater Station Project. The works undertaken by the Evolve Bayswater Alliance will primarily include:
• Design and delivery of a new fully operational and integrated
Station at Bayswater and Turnback Siding;
• Make amendments to the existing Rail Infrastructure;
• Demolish and remove the Existing Bayswater Station; and
• Develop and integrate the Station Precinct and Station
Surrounds.
General Scope of Works – Drainage Install
• Supply plant and labour to install precast drainage structures
• Supply plant and labour to install precast drainage structures