Tender Description
Overview
MidCoast Council is seeking an experienced contractor to crush, grind, screen and process stockpiled concrete, bricks and tiles under a five-year, non-exclusive, as-required contract.
Purpose
Council receives concrete, bricks and tiles at its Waste Management Centres for processing and beneficial reuse. Council is seeking a safe, reliable and environmentally compliant service that maximises the beneficial reuse of concrete, bricks and tiles while maintaining safe and efficient operation of its Waste Management Centres.
Scope
The scope includes:
- Crushing, grinding, screening and processing of stockpiled concrete, bricks and tiles at Council's Waste Management Centres at Taree, Gloucester and Stroud
- Production of finished products comprising 20 mm minus road base, 40 mm minus road base, and 80 mm minus cobbles
- Provision of all personnel, supervision, mobile processing plant, loaders, screening and magnetic-separation equipment, water-based dust suppression, traffic controls, site establishment, product testing, stockpiling, cleaning, reporting and demobilisation required to complete each processing occurrence
- Commencement of site establishment within 21 calendar days for standard Service Requests, or within seven calendar days for urgent Service Requests (up to four urgent requests permitted each Contract Year)
- Preparation of a master Traffic Management Plan and Site Establishment Plan at the start of the Contract, reviewed and updated before each processing occurrence
- Maintenance of an unexpected-asbestos procedure covering immediate cessation of work, isolation and quarantine, notification, competent assessment, licensed removal where required and clearance before work recommences
Key Outcomes and Service Requirements
- Timely acknowledgement, programming and commencement of standard and urgent Service Requests
- Continuous and diligent completion of each processing occurrence
- Effective control of dust, respirable crystalline silica, noise, sediment, runoff and other pollution risks
- Immediate stop-work and notification procedures for suspected asbestos, excessive dust or other environmental and safety incidents
- Processing of material into compliant 20 mm, 40 mm and 80 mm finished products
- Product sampling and testing by appropriately qualified personnel and NATA-accredited laboratories
- Neat, stable and clearly separated finished-product stockpiles
- Removal and return to Council of separated steel and recoverable metals
- Complete cleaning and sweeping of processing pads, roads and adjacent areas
- Protection and cleaning of drains, grates, channels and other infrastructure
- Completion of a handover checklist, supporting photographs and Council sign-off before demobilisation
- Accurate production, testing, incident and performance reporting
Contractor Requirements
- Suitable mobile crushing, grinding, screening, loading and magnetic-separation equipment, together with sufficient trained personnel, backup plant and business-continuity arrangements
- Continuous water-based dust suppression is mandatory; dry processing is not permitted
- Capable of operating safely within active public waste facilities while maintaining access for residents, Council personnel and other contractors
- Services require physical attendance at the nominated facilities and cannot be provided remotely
- Compliance with the Protection of the Environment Operations Act 1997 and applicable regulations
- Compliance with the Work Health and Safety Act 2011 and Work Health and Safety Regulation 2025
- Compliance with applicable crystalline-silica requirements
- Compliance with the relevant recovered aggregate resource recovery order and exemption
- Compliance with each facility's Environment Protection Licence and operating requirements
- Compliance with all other applicable NSW and Commonwealth laws, standards and codes
- Desirable attributes include demonstrated experience at active waste or resource-recovery facilities, strong backup-plant capacity, effective public-interface controls, transparent electronic reporting and practical initiatives that improve product quality, environmental performance and resource-recovery outcomes
Contract Terms and Conditions
- Five-year, non-exclusive, as-required contract
- Council does not guarantee any minimum quantity, number of processing occurrences, product-grade mix or expenditure
- Tendered rates are to be all-inclusive rates per cubic metre of accepted finished product, measured by survey of the finished stockpiles
- Historical or estimated quantities are indicative only and do not represent guaranteed future volumes, composition, contamination levels, processing yield or frequency of work
- Council will apply contractual performance remedies, agreed damages and cost-recovery provisions for late commencement, failed site handback, off-specification products, dust escape, environmental or safety incidents, incomplete cleaning and late reporting
Location
- Facility: Taree Waste Management Centre
- Map: View on Google Maps
- Facility: Gloucester Waste Management Centre
- Map: View on Google Maps
- Facility: Stroud Waste Management Centre
- Map: View on Google Maps
Location
Similar Tenders
Active opportunities matching this tender's categories and regions.