Closed
Supply and Installation of Accoustic Curtains for Residents - North-South Corridor: Torrens to Darlington section
Tender ID: 619926
Tender Details
Organisation:
Tender #:
-
Status:
Closed
Publish Date:
17 July 2026
Closing Date:
27 July 2026
Tender Description
Overview
T2D Alliance (SA) is seeking a subcontractor to supply and install acoustic curtains for residents along the North-South Corridor: Torrens to Darlington section. The subcontractor shall provide all labour, materials, plant, equipment, supervision, transport, consumables, and incidentals necessary to complete the works.
Scope
Locations
- Property owner details will be provided by T2D CJV to arrange appointments unless otherwise advised
- Works will be undertaken at multiple residential properties within the Project alignment
- Locations will be issued progressively by T2D CJV representatives
- Property numbers and installation sequencing will vary depending on resident eligibility and program requirements
Pre-installation Activities
- Availability to undertake pre-installation activities outside business hours if required
- Attending properties as directed by T2D CJV to measure windows and openings
- Assessing site conditions, access constraints, and fixing requirements
- Confirming curtain configuration, fixing method, and installation approach
- Providing documentation detailing installation locations and any pre-existing defects
- Submitting quotations based on measurements and agreed specifications unless otherwise advised by T2D CJV
Supply of Acoustic Curtains
- Supply of multi-layered acoustic curtain systems, including a mass-loaded barrier layer (e.g. mass loaded vinyl or equivalent) for sound transmission loss, an internal absorptive layer to improve sound absorption, a block-out/lining layer on the window side to reduce light spill and sound leakage, and a suitable residential-grade outer fabric
- Supply of acoustic curtains meeting Principal requirements, including blackout properties where required, durable fabric, suitable colour and finish for residential use, and compliance with relevant Australian Standards
- Supply of all associated components, including tracks, fixings, brackets, pelmets (if required), and ancillary materials
- Ensuring all materials are new and fit for purpose
Location
- Site: North-South Corridor: Torrens to Darlington section, multiple residential properties within the Project alignment
- Map: View on Google Maps