Awarded
Pilbara Generation Project - Design and Construction of Battery Energy Storage Systems (BESS)
Tender ID: 431088
Tender Details
Organisation:
Tender #:
540PGC0004
Status:
Awarded
Closing Date:
21 September 2020
Awarded Date:
06 May 2021
Tender Description
At the time of publishing this invitation to register an interest, the Works include the following:
Design, fabrication, construction and integration into the Fortescue electricity network of two BESS:
- i. Solomon BESS, at Solomon power station – 20MVA/ 3MWh
- ii. North Star BESS at North Star substation – 37.5MVA/5MWh
The Contractor must ensure that all aspects of the Works comply with all relevant and current Australian Standards, ISO’s and Australian regulations.