Closed

Whanawhana Bridge Replacement

Tender ID: 617485


Tender Details

Tender #:
P2026-618  
Status:
Closed
Publish Date:
19 June 2026
Closing Date:
29 July 2026
Closing Time:
03:00 PM (NZ)

Tender Description

⁠⁠⁠The contract reference number and name

Project Number: PRJ23-91

Procurement Number: P2026-618

Project Name: Whanawhana Bridge Replacememt

Prequalification categories: Bridge Construction Class A

Description of works required

The proposed design is for the construction of a 47m single lane bridge at Whanawhana Road

The scope of the work includes:

  • Design and management of temporary works
  • Obtaining Steel casing & SHC Beams
  • Undertaking Piling and Temporary Causeway
  • Construction of Substructure
  • Construction of Superstructure
  • Construction of Pavement and Line Marking
  • Undertaking Traffic Management
  • Consultation and engagement with the Mana Whenua Group

When (date and time) does it need to be submitted?

Wednesday 22nd July 2026 at 3pm

Deadline for Supplier Questions:

Thursday 16th July 3pm

Council to respond to Supplier Questions (Deadline) by Tuesday 21st July 2026 at 12pm

How and where should it be submitted?

Submit your Quote via the etender in-box.

We will not accept Quotes sent by post or delivered to our office.

Process for RFT Submission:

For resources on submitting a Quote: https://www.procurement.govt.nz/procurement

If you have any questions, ask our Point of Contact (see above) before the Deadline for Questions.

Use the Response Form to submit your Quote.

Complete and sign the declaration at the end of the Response Form.

Check you have provided all the necessary information in the correct format and order.

Submit your response before the Deadline for the close of the tender.

TOTAL submitted file size must not exceed 50MB, HDC’s preference is to receive submissions in one file unless specified.

Complete your Summary below:

Information available and suppliers’ question must be directed via the etender portal.

The tender evaluation is via price quality with pass/fail on; Bridge construction – level A, bridge construction track record. Anchored weighting of Relevant Skills (15%), Methodology and Programme (25%), Economic Benefits (10%) and Price (50%).

Contact: AMBS@hdc.govt.nz


Location